Lesson 5 of 8 · 40 min

Controls: designing what you rely on

Control types and categories, writing a control that can be tested, ownership, and keeping a control baseline honest about what is actually implemented.

By the end of this lesson you can

  • Classify a control by function, by nature and by how it runs
  • Write a control statement that someone else can test
  • Assign one accountable owner and keep operator and reviewer apart
  • Keep a control baseline whose statuses match what is actually in place

1What a control is for

A control is something the organization does, on purpose and repeatedly, to make a good outcome more likely or a bad one less likely. A second approval before a payment is released is a control. So is disk encryption, a locked server room or a review of who can reach payroll.

Every control serves a control objective: a plain statement of what must be true. Take Big Venture Incorporated, a fictional freight-software company of about 600 people. One of its objectives reads: "Only authorized people can access the finance system, and only for as long as they need it." No single control achieves that. An approval step for new access, multi-factor sign-in, a quarterly access review and removal on the day someone leaves all serve it together.

Start from the objective. Without one, nobody can say whether a control is enough, too much or aimed at the wrong thing. The obligations behind it come from frameworks and contracts (lesson 3); the exposure it reduces comes from the risk register (lesson 4).

2Two ways to classify a control

Controls are sorted along two independent axes. Function is about timing: does it stop the event, notice it or recover from it? Nature is what it is made of: a process, a technology setting or something physical.

  • Preventive controls stop an unwanted event before it happens.
  • Detective controls find an event that has happened, or is happening, so someone can act.
  • Corrective controls limit the damage and restore normal operation afterward.

Any function can be delivered by any nature, which gives a small matrix:

NaturePreventiveDetectiveCorrective
AdministrativeManager approval before access is granted; background checks before hireQuarterly user access review; monthly account reconciliationIncident response plan; revoking access after a policy breach
TechnicalMulti-factor authentication; firewall rules that block trafficAlerts on repeated failed sign-ins; log monitoringRestoring systems from backup; quarantining a malicious file
PhysicalBadge-controlled doors to the server roomCamera coverage; door-held-open alarmsFire suppression; a standby generator

Administrative controls are also called managerial controls. Two more labels are common. A deterrent control discourages an attempt, such as a sign-in banner warning that activity is monitored. A compensating control stands in for one that cannot be implemented as written (section 6).

Use the matrix as a design check: if every control behind an objective is preventive, nobody will notice when prevention fails.

3How a control runs, and which ones carry the weight

A third question is who, or what, performs the control. The answer changes how it is tested and how it fails.

Manual

A person does it.

A manager approves a vendor before onboarding. Flexible and able to use judgment, but people get busy, skip steps and leave.

Automated

A system does it.

The identity platform enforces multi-factor sign-in. Consistent every time, as long as nobody changes the configuration unnoticed.

IT-dependent manual

A person acts on system output.

A reviewer works through a system-generated list of active accounts. The review is only as good as the list: if the report is incomplete, so is the control.

Not every control deserves the same attention. A key control is one the organization relies on to meet an objective or reduce a significant risk; if it failed, the objective would not be met. Non-key controls support the key ones or add depth. Key controls get the most careful documentation and the most rigorous testing. Calling everything key spreads attention so thin that nothing gets it.

4Writing a control someone can test

A control statement is a promise the organization will later have to prove. If a tester cannot tell from it what should have happened, they cannot tell whether it did. A good statement answers five questions:

  • Who performs it, named as a role, not a person or a team.
  • What they do, as a specific action on a specific scope.
  • When, as a frequency or trigger: quarterly, daily, on every change, on termination.
  • How: the source they work from and what they do with exceptions.
  • Evidence: the record the control leaves behind, and where it is kept.

The weak version cannot fail, which is the problem. "Regularly" has no deadline, "reviewed" has no outcome and nobody is named. The strong version can be checked line by line, and a missed quarter shows up as a missing file.

The "who" hides three roles that are often blurred:

Owner

Accountable for the control's design, for it operating as written and for fixing it when it does not. One role, never a committee or "IT".

Operator

Performs the control day to day. There may be several, such as each application owner running their own review.

Reviewer

Checks that the control was performed properly. Should be someone other than the operator, or the check means little.

One person can be owner and operator of a small control. What matters is that exactly one role is accountable, and knows it.

5The control baseline, told honestly

The control baseline (also called the control library) is the single list of every control the organization relies on. Audits, questionnaires and board reports all draw from it, so every control carries the same fields:

  • Control ID and statement, written as in section 4.
  • Owner and frequency.
  • Mapped requirements: every framework clause, regulation or contract term the control answers.
  • Implementation status, with the date it was last assessed.
  • Evidence link to where the control's records live.
  • Last reviewed: when someone last confirmed the statement still matches reality.

Implementation status is where baselines most often drift from the truth. A small, defined scale works better than a percentage:

StatusWhat it means
Not reviewedNobody has assessed it yet. The status is unknown, not bad and not good.
Not implementedAssessed, and the control is not in place.
Partially implementedSome of the control exists, with significant gaps in scope or operation.
Largely implementedIn place for most of its scope, with minor gaps that are known and tracked.
Fully implementedIn place across its whole scope and producing the evidence its statement promises.
Not applicableDoes not apply, with a recorded reason and who approved it.

"Implemented" is not proof the control works; testing that is lesson 6.

6Compensating controls and control drift

Sometimes the expected control cannot be put in place. Big Venture's legacy warehouse system cannot support multi-factor sign-in. Rather than mark the requirement met, the team allows access only through a jump host that requires multi-factor sign-in, restricts network access to it, and has the security lead review its session logs weekly. That is a compensating control. It is acceptable when:

  • The original control is genuinely not feasible, for a recorded reason.
  • The alternative meets the original's intent and reduces the same risk comparably.
  • It has its own owner, statement and evidence, like any other control.
  • The risk owner approved it, with a date to revisit it.

Even good controls decay. Control drift is the gap that opens between what the baseline says and what happens.

People leave

The owner moves on, nobody inherits the control, and the quarterly review quietly stops.

Systems change

A new application never enters review scope, or a migration stops forwarding the logs an alert depends on.

Exceptions become the rule

A one-off approval bypass during an outage is still in use six months later.

The schedule slips

Quarterly becomes "when there is time", and the evidence folder shows the gap before anyone says so.

The defense is to treat a control as a lifecycle, not a document written once.

The control lifecycle Five stages in a row: design, implement, operate, monitor and improve, joined by arrows. A return arrow runs from improve back to design. An amber callout above the operate stage reads: drift, people leave, systems change, the schedule slips. Drift: people leave, systems change, the schedule slips Design objective, owner, statement, evidence Implement built and in place, status recorded Operate runs on schedule, leaves evidence Monitor checks and tests, drift spotted Improve fix, redesign or retire what monitoring finds feeds the next design
Controls are monitored for drift, and what monitoring finds goes back into the design.

7In practice: audit five of your own controls

Pick five controls you think of as key. Give it forty minutes.

  1. Name the objective each one serves, in one sentence.
  2. Classify each one by function, nature and how it runs. Is anything behind an objective detective?
  3. Rewrite the weakest statement to answer who, what, when, how and what evidence. Could a colleague test it from the text alone?
  4. Check ownership. One accountable owner, still here, who knows it? A reviewer who is not the operator?
  5. Re-score the status on the six-level scale, marking anything you have not looked at as "not reviewed". Compare with your last report.

8Key terms

Control objective
The outcome one or more controls exist to achieve, stated as what must be true.
IT-dependent manual control
A control a person performs using system-produced information, so that information's reliability is part of the control.
Key control
A control relied on to meet an objective or reduce a significant risk; if it fails, the objective is not met.
Control owner
The one role accountable for a control's design, operation and correction.
Control baseline
The single list of every control relied on, with owner, mapping, status and evidence for each.
Compensating control
An approved alternative that meets the intent of a control that cannot be implemented.
Control drift
The growing gap between what the baseline says a control does and what actually happens.

Knowledge check

5 questions

Q1Every Monday the security lead pulls a report of newly created admin accounts from the identity system and investigates any that lack an approved request. How is this control best classified?

Q2Which rewrite turns "Backups are tested regularly" into a control statement that can be tested?

Q3A baseline has 120 controls: 70 assessed as fully implemented, 30 assessed at lower levels, and 20 never assessed. How should the 20 appear in the report to leadership?

Q4A quarterly access review is performed by four application owners and checked by the IT manager. Who should be recorded as the control's owner?

Q5A legacy system cannot support multi-factor sign-in. Which response is an acceptable compensating control?

Answer every question to complete the lesson. Your answers stay in this browser.